Beijing Cell Surveys

Previous Page 3 of 5 Next
DK038
A solumn occasion (Diana's photo).
TB956
Why do I always get stuck with the bill? (Tyler's photo)
DS1714
Beam, we need beam!
DK026
Power, we just need power! (Diana's photo).
DSCN0108
Beam finally on, Tony & Brad checking for neutrons on the ramp.
DSCN0109
The cart (thank you Tyler!) helps with measurements at 1.7 m...
DSCN0110
.... and at 1 m and 30 cm too.
DSCN0113
Dara placing dosimeters on the roof above Cell 3.
DSCN0115
DSCN0118
A cheery inmate.
DSCN0120
Jiao & Jackie: no H2O, temp rising, expect beam off in 10 min.
DSCN0121
Tony, Xue, Brad: even with cart, surveys aren't the easiest...
DSCN0125
...when you're on a construction site. Fortunately....
DSCN0124
...Tony & Xue are alert & suggest completing, all critical ....
DSCN0123
..beam & jaw configurations while we're set-up along this wall.
DSCN0127
2007 fall protection: quite the fashion statement.
DSCN0136
Tyler demos that fall protection is not JUST for fashionistas.
DSCN0140
Dismantling of VMS China-cam (sorry Warren!)